COMPLETION OF AFGHAN MINISTRY OF DEFENSE (MOD) BUILDING 100

Location:       Ministry of Defense Headquarter, Kabul Afghanistan.

Description:             The project includes a five-story HQ building and one Basement, approx. 40,000 sq. meters of offices, administration, DFAC with a 936 fixed-seat Auditorium & Security Bldg, Power Generation Bldg., Fuel Storage, Sewer/Water/Electrical utilities, 800 m3/day WWTP and other misc.

Client:            AFCEC/GILBANE

Build Capabilities and Relevant Job Experience

SSCC self-performed 100% of the work subcontracted from AFCEC/GILBANE for this contract. SSCC provided value engineering due to the changed site conditions in order to optimize design and reduce cost.  SSCC furnished all materials, labor and equipment to complete all works for Structural & Architectural Finishing, Electro-Mechanical, HVAC, Power Plant Bldg. & MV and Step-down Transformers Connections, Elevators, Structural Glazing, Addressable Fire Alarm and Fire Fighting Systems, Lightening Protection System, Roof Waterproofing, Site Utilities, Sewer/Water Supply/Electrical Networks, Lifting Stations, Waste Water Treatment Plant, Drainage Pits, Pumping Stations with Force Main & Landscaping.

Completion Date:               May 02nd, 2015

%MCEPASTEBIN%

Leave a Reply

Your email address will not be published. Required fields are marked *